Search Everything

Find articles, journals, projects, researchers, and more

Back to Articles

Optimised Open Pit Design Using Minessight Software - A Case Study at the Bisha Mining Share Company, Eritrea East Africa

Authors:
Samuel Boachie

Abstract

This study investigates the optimization of open pit design using the Lerchs-Grossman (LG) method within the Minesight Economic Planner software, focusing on the Volcanogenic Massive Sulphide (VMS) orebody at the Bisha Mining Share Company in Eritrea, East Africa. The primary objective is to develop an optimized pit outline that ensures both profitability and safety, considering geological, geotechnical, and economic factors. The research employs a systematic methodology encompassing literature review, comprehensive data collection, and iterative pit optimization and design processes. Key inputs include geological data, geotechnical parameters, and economic variables such as fluctuating metal prices. Geotechnical assessments by BGC Engineering provided critical insights into slope stability and rock mass characteristics, which are essential for safe pit design. The LG method facilitated the generation of optimized pit shells, refined to produce detailed pit designs incorporating practical mining considerations. Results indicated an optimized pit containing 28.31 million tonnes of ore with significant gold, silver, copper, and zinc grades, with a minimal deviation of 2% from the detailed design. This study underscores the efficacy of integrating advanced computational tools and multidisciplinary data in open pit optimization, demonstrating the approach's robustness in achieving feasible and profitable mining operations. The findings also highlight the importance of dynamic economic modeling and continuous geotechnical evaluation to adapt to market fluctuations and ensure long-term operational stability. This research contributes valuable methodologies and insights for the mining industry, promoting enhanced efficiency, safety, and sustainability in open-pit mining practices.

Keywords: Open Pit Optimization Pit Design Lerchs-Grossman Method Bisha VMS Orebody Geotechnical Parameters Mining Economics Minesight Economic Planner Eritrea Mining Resource Modelling Volcanogenic Massive Sulphide (VMS)
DOI: https://doi.ms/10.00420/ms/4730/ST5EV/MFN | Volume: 12 | Issue: 3 | Views: 0
Download Full Text (Free)
Article Document
1 / 1
100%

Subscription Required

Your subscription has expired. Please renew your subscription to continue downloading articles and access all premium features.

  • Unlimited article downloads
  • Access to premium content
  • Priority support
  • No ads or interruptions

Upload

To download this article, you can either subscribe for unlimited downloads, or upload 0 items (articles and/or projects) to download this specific article.

Total: 0 / 0
  • Choose any combination (e.g., 2 articles + 1 project = 3 total)
  • After uploading, you can download this specific article
  • Or subscribe for unlimited downloads of all articles