Search Everything

Find articles, journals, projects, researchers, and more

Back to Articles

Project planning is among the most critical factors to the success of a construction project. In project planning, cost and schedule are closely interrelated, because they share a lot of common data in their planning processes. Therefore, the integration

Authors:
Yi-Jao Chen, Chung-Wei Feng, Yu-Ren Wang, Hsueh-Ming Wu

Abstract

Project planning is among the most critical factors to the success of a construction project. In project planning, cost and schedule are closely interrelated, because they share a lot of common data in their planning processes. Therefore, the integration of cost and schedule functions has been an attractive issue in construction project planning. Many researchers have emphasized the benefits of this integration and several different methodologies combining cost and schedule data have been provided. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project planning. This paper presents a model-based planning system that employs Building Information Model (BIM), Object Sequencing Matrix (OSM), and Genetic Algorithms (GAs) to obtain an optimal crew assignment under resource and workspace constraints. The purposes are to evaluate the project costs and optimize the temporal distribution of resources in project planning. A computer implementation called Cost/Schedule Integrated Planning System (CSIPS) is also developed to verify the feasibility of the proposed approach

Keywords: Project planning is among the most critical factors to the success of a construction project. In project planning cost and schedule are closely interrelated because they share a lot of common data in their planning processes. Therefore the integration
DOI: https://doi.ms/10.00420/ms/5167/CG5FG/QTQ | Volume: 3 | Issue: 1 | Views: 0
Download Full Text (Free)
Article Document
1 / 1
100%

Subscription Required

Your subscription has expired. Please renew your subscription to continue downloading articles and access all premium features.

  • Unlimited article downloads
  • Access to premium content
  • Priority support
  • No ads or interruptions

Upload

To download this article, you can either subscribe for unlimited downloads, or upload 0 items (articles and/or projects) to download this specific article.

Total: 0 / 0
  • Choose any combination (e.g., 2 articles + 1 project = 3 total)
  • After uploading, you can download this specific article
  • Or subscribe for unlimited downloads of all articles