Search Everything

Find articles, journals, projects, researchers, and more

Back to Articles

Feasibility Analysis of Trans-Sumatera Toll Road using Value Engineering Method

Authors:
Mohammed Ali Berawi, Teuku Yuri M. Zagloel, Abdur Rohim Boy Berawi, Yusuf Abdurachman

Abstract

The Trans-Sumatera Toll Road (TSTR) Infrastructure Project is planned to stretch from Bakauheni to Banda Aceh (2527 kilometers), with an estimated investment about IDR 290 trillion. The value engineering method is applied to the TSTR project by creating six additional functions for a toll road: motorcycle lane integration, rest area development, dry port integration, median railways integration, tourism park development, and fiberoptic networking. The feasibility analysis is constructed using a system dynamic approach to three toll tariff scenarios. The result reveals that the additional functions have improved the financial feasibility of TSTR project, with the internal rate of return for the three proposed scenarios ranging from 8.28% to 13.77%

Keywords: Feasibility study Trans-Sumatera Toll Road System dynamic Value engineering
DOI: https://doi.ms/10.00420/ms/7340/6ECCR/CKS | Volume: 6 | Issue: 3 | Views: 0
Download Full Text (Free)
Article Document
1 / 1
100%

Subscription Required

Your subscription has expired. Please renew your subscription to continue downloading articles and access all premium features.

  • Unlimited article downloads
  • Access to premium content
  • Priority support
  • No ads or interruptions

Upload

To download this article, you can either subscribe for unlimited downloads, or upload 0 items (articles and/or projects) to download this specific article.

Total: 0 / 0
  • Choose any combination (e.g., 2 articles + 1 project = 3 total)
  • After uploading, you can download this specific article
  • Or subscribe for unlimited downloads of all articles